Located on the River Tiffey in Norfolk, the Carleton Forehoe site enabled the landowners of
Glebe Farm to make direct hydromorphological improvements by reconnecting the river and
holding water on the floodplain for longer whilst creating benefits for biodiversity.
Drainage was reduced by raising and controlling water levels in the ditches. The ditches became
open, linear water features making the floodplain wetter thus, helping the transition from wet to
drier habitats, boosting biodiversity and niches for different species.
Fish populations will also become more resilient as reconnecting the river with the floodplain and
raising water levels in ditches creates valuable backwaters for spawning.
In addition, holding onto the water for longer will not only encourage percolation into the subsoil
making farming at Glebe Farm more resilient to droughts, but also, will reduce flood risk
downstream at Wramplingham as the river will be reconnected to its floodplain.
The Environment Programme Team worked in Partnership with Norfolk FWAG and the
landowner. Total project cost: £48,152 with a WEIF contribution of £28,132.
Outputs
Outcomes
•
8 culverts and 10 leaky dams installed
•
Increased biodiversity
•
20 ha of improvements to
the hydromorphology
•
Community engagement
•
•
Increased flood and drought resilience
2 km of ditch restoration